• Double Station Hamburger Box Making Machine
  • Double Station Hamburger Box Making Machine
  • Double Station Hamburger Box Making Machine
  • Double Station Hamburger Box Making Machine
  • Double Station Hamburger Box Making Machine
  • Double Station Hamburger Box Making Machine

Double Station Hamburger Box Making Machine

Warranty: One Year
Certification: CE
Application: Commodity, Machinery & Hardware, Textile, Alcohol, Toy, Chemical, Apparel, Gifts & Arts, Dining, Medical, Food
Driven Type: Mechanical
After-Sales Service Provided: Engineers Available to Service Machinery Overseas
Type: Carton Packaging Machinery
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Product Description
  • Technical Parameters
  • Sample
  • Configuration
  • Machine accessories list
  • Packaging & Shipping
  • Customer Questions & Answer
Overview

Basic Info.

Model NO.
ZX-1600
Automatic Grade
Automatic
Machine Weight
2800kg
Speed
100-380PCS / Per Min (According to Box Type )
Machine Size
3600*1850*1700mm
Power
6kw
Transport Package
Wooden Case
Specification
3600mm*1850mm*1700mm
Trademark
ZHIXIN
Origin
China
HS Code
8441309000
Production Capacity
200sets/Year

Product Description

 

Product Description

                                             ZX-1600 Double Workshop Carton Erecting Machine

Double workshop 3D carton machine by pressing the paper directly, not only can be dressed up solid or liquid food, but also reduced the traditional paste box machine boxes should be its open action, greatly shorten the time of boxes of food, meet the environmental protection, health, sealing and rapid flow of fast food to the requirement of packaging. The whole machine conforms to "CE" certification, it also has the characteristics of accurate and stable transmission, high production efficiency and small floor area.

Double Station Hamburger Box Making Machine

Technical Parameters

 
Model : ZX-1600
Speed: 100-180pcs/min
Material: 200-620gsm
Corrugating paper thick:1.6mm


Box size:

Length:   
L100-450mm  
Degree:5°-45°
Width: B100-600mm
Height: H 15-200mm
Power : 6kw
Air requirement: 0.5Mpa, 0.4cube/min
Voltage: 380V  50Hz
Size: 3600*1850*1700mm
Weight:
 
2800kgs
 Note:

Standard machine with foam touched wheel glue, use cold glue. If you want a much easier operating machine, you can choose an automatic cold glue sprayer system.

If PE/PP coated paper, and some high gloss ink paper uses cold glue, it can't stick. Then you can choose a hot melt glue system, PE/PP coated paper using cold glue can add a plasma device. Plasma for broken PE/PP paper surface, then cold glue can stick.

Automatic cold glue sprayer system, hot melt glue system and plasma price extra.

Double Station Hamburger Box Making Machine

Sample

Double Station Hamburger Box Making Machine 80-120 boxes per min
Double Station Hamburger Box Making Machine 100-130 boxes per min
Double Station Hamburger Box Making Machine 80-120 boxes per min
Double Station Hamburger Box Making Machine 50-80 boxes per min
Double Station Hamburger Box Making Machine 60-80 boxes per min

Configuration

 
Mane Brand
Screen
 
Schneider
PLC
 
Schneider
Servo driver
 
Schneider
Breaker
 
Schneider
Terminal
 
Schneider
AC contactor Schneider








 
Relay
 
Schneider
Switch power supply
 
EAC-CHINA
Buzzer
 
ZXDZ-CHINA

Machine accessories list

 
Double Station Hamburger Box Making Machine

Double Station Hamburger Box Making Machine
 

Packaging & Shipping

Double Station Hamburger Box Making Machine
Double Station Hamburger Box Making Machine

 

 

Customer Questions & Answer

1. How long will your engineer reach our factory?
Within one week after machine arrival your factory.
2. How many days will you finish installing ?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa , air tickets, hotel, food ,and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machines have one year guarantee, starting from finished installation.
5. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for our technician 100USD/day.
6. How could we do if the parts broken within warranty?
 We would express the free replacement parts during the warranty date.
 7. Does your engineer understand English?
 Our engineer understand a little English. All our engineers have more than five years machine installation experience. In addition, they can use body language to communicate with customer.
 8. Can you help us find any engineer in our location?
 Of course, we will check and inform you as soon as possible.
 9. How do we solve the machine problem after your engineer leaving?
 Generally speaking, there will be no problem after finish installing. In case you have any problem, you can contact with our sales at any time. Our engineer will take a solution video according your description.
 10. How many worker do we need running those machines?
Usually two or three people is ok. If it is manual feeding, more people are needed, mainly according to your production capacity.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
10000000 RMB
Plant Area
>2000 square meters